Words, not only numbers
The biggest novelty is that the process now includes «words» and not only «numbers».
Benefits
Orian is not just a tool: it is a methodology. It brings «words» into the process, not only «numbers», with a working method that delivers solutions and consulting.
The biggest novelty is that the process now includes «words» and not only «numbers».
A working method that delivers solutions and consulting from inside the system itself.
Unique and exclusive in the market. Absolutely novel.
Benefits
Fifteen reasons why operations change once the method is inside the system.
It is not just a tool, it is a methodology.
7/24/365 asset management with the most advanced artificial intelligence in the world applied to wind asset management.
Short, medium and long-term control of project O&M. From the smallest detail to the most relevant one.
Control of complex routines that market tools do not cover.
Work and information from internal and external resources used to the full. Full coordination between all parties.
Control of around 95 % of everything related to the assets.
Every variable is considered and combined with the others so that the information can later be used as a single whole.
The maintainer and every other party know that there is control and method in the management of the wind farm. They will be more motivated.
You do not have to think to obtain the information. You think once you have it: several steps are climbed at once.
At the forefront of wind farm management. The most advanced technology applied to any wind farm.
Time saved, both in data entry and in later processes.
Immediate, current information and results from very complex and deep analysis.
Detailed monitoring of the condition of the turbines.
Analysis and comparison between the wind farms of the defined sub-portfolios.
You do not have to look for the problem. If it appears, you will be notified.
Prevention
Seventeen situations that happen in operations today and stop happening once there is control and method.
Shortcomings in the completion of preventive work.
Lack of knowledge about the work carried out in the wind farms and the companies performing it.
Loss of generated energy in the evacuation of the wind farm.
Breach of contractual conditions.
Maintenance teams working in other wind farms in the area.
Blade damage that has to be assumed by the owner.
Lack of knowledge about repair times for small and large major corrective work.
Shortcomings in the resolution of turbine incidents.
Breach of response times during working hours and on public holidays.
Lack of knowledge about serial defects in the portfolio, the wind farms, the components or even the component manufacturers.
Lack of knowledge about changes in the results of gearbox oil analyses.
Lack of knowledge about high losses caused by curtailment.
Poor O&M practices.
Lack of knowledge about turbine shortcomings and their possible poor condition.
Wind farms or turbines without the latest agreed retrofits or software versions.
Lack of knowledge about shortcomings in specific turbines or components.
Longer periods between operations meetings and breach of the commitments of the maintainer and the owner.
Outcome
The cumulative effect of the method on the value of the asset.
Better condition of the turbines.
Better production.
Higher asset value.
Longer service life.
Higher value of the management team.
Major improvement in the economic performance of the projects in the short, medium and long term with a low investment.
Wind farm operation
Five groups of information that are recorded, cross-referenced and turned into decisions.
Daily news
Daily news for the portfolio and for each wind farm, tracking compliance with the main KPIs.
Portfolio summary
Assets
6
5 wind farms · 1 solar plant
Capacity
21–68MW
Range across assets
Wind turbines
81
Under monitoring
Components
1.701
With associated history
Today's thread
Daily forecast published. Moderate westerly wind with gusts in the afternoon at the eastern farms. Forecast
Yesterday's production. Deviation of −3.2% against the portfolio target. Production
Planned work. Three preventive jobs scheduled and one corrective intervention at Wind Farm 3. Work
Availability. Wind Farm 3 closes the day below the agreed threshold. Analysis
Alerts
Alerts about important situations, based on their consequences and impact on operations, applied to the portfolio, wind farms, turbines and components, with explanatory charts or tables where applicable.
Problems in the energy evacuation of the wind farm
Breach of technicians assigned to the wind farm
Blade inspection after the storm season
Tasks pending from the owner
Performance loss at high wind speeds
Too few preventive hours
High losses from stops or curtailment
The intervals between preventive work are not respected
Poor response times on public holidays
Turbines running different software versions
Many leaks, not permanently repaired
Duration of major corrective work above the portfolio average
Breach of open points in meeting minutes
And many more
Delivery channels
Email, push notifications, Slack, Telegram…
You do not have to think to obtain the information. You think after obtaining it.
Orian
Reports
Different reports depending on the selected moment, split by portfolio, wind farm, turbine and component.
Depending on the selected moment.
Portfolios, wind farms, turbines and components.
No irrelevant information.
Unlimited and generated on the spot.
A real example
In a portfolio of five wind farms with twelve turbines each, reports would be available at any moment for:
1
portfolio
5
wind farm
60
turbine
480
component
Only the essentials
Unlimited reports, generated on the spot.
Request a demo